Page 68 - Hong Kong Housing Society Sustainability Report 2024/25
P. 68
BESS and Hydrogen Fuel Cell System Integrated Building Management System
(“iBMS”) and IoT
電池儲能系統和氫燃料電池系統
綜合樓宇管理系統及物聯網
During the construction stage, we require The iBMS serves as a centralised control system
contractors to install BESS to minimise the use that integrates a facility’s mechanical, electrical,
of diesel generators, thereby reducing GHG IT, and security systems into a single interface,
emissions and improving the work environment. streamlining the workflow. Complementing
Additionally, in collaboration with Towngas, a pilot this system, IoT technologies enable devices
application of Hydrogen Fuel Cell System will be and facilities to collect and share real-time
implemented to support the construction power information. This network of interconnected
demand for the Ming Wah Dai Ha Redevelopment devices provides valuable insights for immediate
(Phase II) project in 2025. optimisation of building performance.
在施工階段,我們要求承建商安裝電池儲能系統,以 We successfully deployed the iBMS at the Kai
減少使用柴油發電機,從而減少溫室氣體排放,為工 Tak Area 1E Site 1 project. During the reporting
人提供更好的工作環境。此外,我們與香港中華煤氣 year, the design and integration of IoT application
有限公司合作,試行氫燃料電池系統,在二零二五年 with iBMS for this project was also completed,
為明華大廈重建項目(第二期)供應補給部分施工電 enhancing the energy consumption monitoring
力。 capabilities and management operations.
綜合樓宇管理系統是一個將所有機電、資訊科技和保
安相關系統整合為單一介面的主控系統,以簡化工作
流程。同時,物聯網技術使設備和設施能夠收集和分
享實時資訊。這些互通的裝置系統提供寶貴的資訊,
協助我們迅速優化建築物的效益表現。
我們成功在啟德第1E區1號用地項目採納綜合樓宇管
理系統。在報告年度內,我們亦完成物聯網應用與綜
合樓宇管理系統的設計和整合,提升能源消耗監察能
力和營運管理。
• BESS at Hung Shui Kiu Phase II Project Site
洪水橋第二期項目的電池儲能系統
66 Hong Kong Housing Society Sustainability Report 2024/25 香港房屋協會 2024/25 可持續發展報告 67